{"id":8686,"date":"2026-09-10T07:37:43","date_gmt":"2026-09-10T07:37:43","guid":{"rendered":"https:\/\/expediente898.com\/?p=8686"},"modified":"2026-10-22T06:14:31","modified_gmt":"2026-10-22T06:14:31","slug":"construccion-de-barda-perimetral-en-colegio-de-bachilleres-no-29","status":"publish","type":"post","link":"https:\/\/expediente898.com\/?p=8686","title":{"rendered":"CONSTRUCCI\u00d3N DE BARDA PERIMETRAL EN COLEGIO DE BACHILLERES No. 29"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10073124\/Distrito-9-Obra-49-Foto-1.jpg\" alt=\"Construcci\u00f3n de barda perimetral en Colegio de Bachilleres No. 29\"><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10073136\/Distrito-9-Obra-49-Foto-2.jpg\" alt=\"Construcci\u00f3n de barda perimetral en Colegio de Bachilleres No. 29\"><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10073148\/Distrito-9-Obra-49-Foto-3.jpg\" alt=\"Construcci\u00f3n de barda perimetral en Colegio de Bachilleres No. 29\"><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10073201\/Distrito-9-Obra-49-Foto-4.jpg\" alt=\"Construcci\u00f3n de barda perimetral en Colegio de Bachilleres No. 29\"><\/figure>\n<p><video controls preload=\"metadata\" width=\"100%\"><source src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10073215\/Distrito-9-Obra-49-Video-1.mp4\" type=\"video\/mp4\"><\/video><video controls preload=\"metadata\" width=\"100%\"><source src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10073227\/Distrito-9-Obra-49-Video-2.mp4\" type=\"video\/mp4\"><\/video><\/p>\n<h3>TESTIMONIAL<\/h3>\n<p><video controls preload=\"metadata\" width=\"100%\"><source src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10073239\/Distrito-9-Obra-49-Testimonial.mp4\" type=\"video\/mp4\"><\/video><\/p>\n<p><strong>DISTRITO<\/strong><br \/>9<\/p>\n<p><strong>TIPO DE OBRA<\/strong><br \/>Construcci\u00f3n de barda perimetral<\/p>\n<p><strong>LOCALIDAD<\/strong><br \/>Pob. Kil\u00f3metro 30, Acapulco de Ju\u00e1rez, Guerrero<\/p>\n<p><strong>INVERSI\u00d3N CONTRATADA<\/strong><br \/>$2,070,413.04<\/p>\n<p><strong>N\u00daMERO DE CONTRATO<\/strong><br \/>MAJ-FAISMUN\/153-2023\/AD<\/p>\n<p><strong>FECHA DE INICIO<\/strong><br \/>17 de junio de 2023<\/p>\n<p><strong>FECHA DE FINALIZACI\u00d3N<\/strong><br \/>14 de septiembre de 2023<\/p>\n<h2>DESCRIPCI\u00d3N GENERAL<\/h2>\n<p>Construcci\u00f3n de barda perimetral mediante trabajos preliminares de trazo y nivelaci\u00f3n, desmontaje de malla cicl\u00f3nica y demoliciones; cortes y excavaciones; muro de piedra braza, filtro y dren; zapatas, anclajes, castillos y cadenas de concreto; muro de block; reja a base de PTR, port\u00f3n de acceso, pintura y limpieza general.<\/p>\n<h2>ESTATUS DE VERIFICACI\u00d3N<\/h2>\n<p>DOCUMENTALMENTE CONCLUIDA \u2014 SIN ESTATUS DE VERIFICACI\u00d3N DE CAMPO REGISTRADO<\/p>\n<h2>EXPEDIENTE<\/h2>\n<p><iframe src=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10150315\/Distrito-9-Obra-49-Expediente-PDF.pdf\" style=\"display:block;width:100%;max-width:100%;height:780px;height:clamp(400px,70dvh,780px);border:1px solid #d5d5d5;\" loading=\"lazy\"><\/iframe><\/p>\n<p><a href=\"https:\/\/expediente898-media.s3.amazonaws.com\/wp-content\/uploads\/2026\/09\/10150315\/Distrito-9-Obra-49-Expediente-PDF.pdf\" target=\"_blank\" rel=\"noopener\">ABRIR EXPEDIENTE PDF<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TESTIMONIAL DISTRITO9 TIPO DE OBRAConstrucci\u00f3n de barda perimetral LOCALIDADPob. Kil\u00f3metro 30, Acapulco de Ju\u00e1rez, Guerrero INVERSI\u00d3N CONTRATADA$2,070,413.04 N\u00daMERO DE CONTRATOMAJ-FAISMUN\/153-2023\/AD FECHA DE INICIO17 de junio de 2023 FECHA DE FINALIZACI\u00d3N14 de septiembre de 2023 DESCRIPCI\u00d3N GENERAL Construcci\u00f3n de barda perimetral mediante trabajos preliminares de trazo y nivelaci\u00f3n, desmontaje de malla cicl\u00f3nica y demoliciones; cortes y [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8662,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[71],"tags":[],"class_list":["post-8686","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-distrito-9"],"_links":{"self":[{"href":"https:\/\/expediente898.com\/index.php?rest_route=\/wp\/v2\/posts\/8686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/expediente898.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/expediente898.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/expediente898.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/expediente898.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8686"}],"version-history":[{"count":4,"href":"https:\/\/expediente898.com\/index.php?rest_route=\/wp\/v2\/posts\/8686\/revisions"}],"predecessor-version":[{"id":11142,"href":"https:\/\/expediente898.com\/index.php?rest_route=\/wp\/v2\/posts\/8686\/revisions\/11142"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/expediente898.com\/index.php?rest_route=\/wp\/v2\/media\/8662"}],"wp:attachment":[{"href":"https:\/\/expediente898.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/expediente898.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/expediente898.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}